title: "Audit Synthesis Report — Full Audit v1.5, 2026-05-05" type: audit-report date: 2026-05-05 phase: synthesis

Audit Synthesis Report — 2026-05-05

This is the synthesis report for the Full Audit v1.5 run of 2026-05-05 — a subsequent full audit (post-2026-04-25 baseline; following seven Phase 8 runs between 2026-04-27 and 2026-05-05). The run answered seven questions; this report names the answers, points to the evidence in the per-phase reports, and queues what remains.

1. Current thesis architecture — what changed and why

Decision: Option γ — α–δ split with explicit rewrite of α-content. Adjudicated by user 2026-05-05 at the PF7 thesis-architecture decision gate.

What changed:

  • The slug science-secrete-stiftung-chiasm (formerly live, medium confidence) is now contested. The four-element-mutual-conditioning content is held under contested status because Agent A's structural-contradiction findings showed the joint operation is under-evidenced in MP's published text (not false; merely without published-corpus attestation of co-deployment). Status History documents the user's adjudication.

  • A new claim mp-painter-as-primary-witness-for-indirect-ontology (created at live, medium) preserves the painter-side specificity that survives δ. It claims painting in particular is the primary witness for indirect ontology, without claiming the four-element synthesis structure.

  • δ (coherent-deformation-universal-operative-form, supported, medium) stays supported. Its Payoff section was expanded to acknowledge the architectural reframing it has effected; the claim text itself is unchanged.

  • 8 δ-affected concept pages were rewritten on H_synth-affected sections to align with γ. The wiki no longer says both H_synth and δ in overlapping sections.

Why: Agent A's thesis-coherence memo (thesis-coherence-2026-05-05.md) identified three specific propositions on which H_synth and δ structurally contradict — architecture (4-element synthesis vs 3-tier expressive cluster), where coherent deformation anchors (painterly-specific vs universal operative form), and whether the chiasm + Stiftung joint-operation grammar is in MP's published text. δ's adoption to supported at the sixth Phase 8 run had already pressured H_synth's status; the wiki was operationally signaling both. The user's γ decision resolves the contradiction by keeping each thesis's actual work without claiming work it does not do.

See: wiki/.audit/thesis-coherence-2026-05-05.md; wiki/.audit/synthetic-layer-2026-05-05-eighth-run-gamma.md; AUDIT_PLAN.md v1.5 header (decision recorded).

2. Claims promoted, downgraded, restated, contested, or retired

Register state delta: 80 → 81 entries. Status delta: 6 supported / 43 live / 31 candidate / 0 contested / 0 retired → 6 supported / 43 live / 31 candidate / 1 contested / 0 retired.

Contested: science-secrete-stiftung-chiasm (live → contested) per γ adjudication.

Created at live: mp-painter-as-primary-witness-for-indirect-ontology (NEW; the γ-split successor slug). 3-test gate passes; counterpressure includes δ's universality finding, the H_synth contesting, and the November 1960 V&I working note framing.

Restated under γ (no status changes): 9 cross-reference / payoff updates on existing claim entries — coherent-deformation-universal-operative-form Payoff expansion; kaushik-stiftung-literary-frame Counterpressure tightened; ip-pop-architectural-hierarchy, ineinander-universalizes-institution, faul-institutional-camp, mp-1942-already-prefigures-late-sedimentation, time-as-late-mp-privileged-ontological-clue cross-reference framings; ingested-corpus-four-element-gap Payoff restated; circulus-vitiosus-deus-mp-ontology-of-ontology cite-back text update.

Promoted candidate→live: 0 this run. The seventh run discharged the eligible candidates from the post-2026-04-28 ingest cycle.

Promoted to supported: 0 non-δ this run. 9 δ-affected supported HALTs recorded per PF6 (binding) — these may not be promoted to supported until γ-decision propagation completes.

See: wiki/.audit/synthetic-layer-2026-05-05-eighth-run.md §"Promotions"; wiki/claims.md Summary table.

3. Thesis-central pages now upgraded

8 δ-affected pages rewritten under γ (substantive body revision aligning with α–δ split): [[science-secrete]], [[coherent-deformation]], [[chiasm]], [[stiftung]], [[indirect-ontology]], [[fundamental-thought-in-art]], [[institution]], [[ineinander]]. The wiki's surface-level H_synth/δ contradiction is resolved.

7 Step 8.5 first-wave pages with full v0d optional-section coverage (What the Concept Does / What It Rejects / Stakes / Problem-Space): [[systeme-d-equivalences]], [[indirect-language]], [[hyper-dialectic]], [[hyper-reflection]], [[flesh-as-element]], [[wild-being]], [[sedimentation]]. These were Agent F's first-wave priority list; the 5 deferred to next run are [[passivity]], [[contingency-of-the-future]], [[perceptual-faith]], [[lateral-universal]], [[primordial-expression]]. Three HIGH-priority δ-affected Step 8.5 pages remain deferred until further architectural-decision propagation: [[institution]] (already upgraded in seventh run), [[fundamental-thought-in-art]], [[ineinander]].

1 new entity stub with explicit raw-absence acknowledgment: [[simone-de-beauvoir]].

See: wiki/.audit/optional-section-coverage-2026-05-05.md; wiki/.audit/synthetic-layer-2026-05-05-eighth-run-step85.md.

4. Raw absences still blocking confidence upgrades

Per wiki/.audit/raw-inventory-2026-05-05.md and the Phase 7 + Phase 8 work:

  • Saint Aubert 2006 Vers une ontologie indirecte — the most consequential single absence. Gates (a) the Saint Aubert backlog Priority A pages (5 pages: [[hyper-reflection]], [[lebenswelt]], [[ontological-difference]], [[nonphilosophy]], [[schneider-case]]); (b) mp-painter-as-primary-witness-for-indirect-ontology (live; potential promotion to supported); (c) wild-being-extends-to-physics (live; corroboration / qualification at the level of late-MP's indirect-ontology architecture); (d) time-as-late-mp-privileged-ontological-clue (candidate; potential promotion to live). Hardest-blocking single absence per seventh-run line 256.

  • Beauvoir Le deuxième sexe (1949) — gates mp-beauvoir-1949-convergence-on-gender (candidate → live).

  • Berghofer-Wiltsche 2024 Phenomenology and QBism — gates [[wild-structure]] Open Questions and possibly wild-being-extends-to-physics (live → supported).

  • Reynolds 2002 / 2004 — gates parergon-cezanne-mp-outlines-structural-parallel (candidate, low → live).

  • Saint Aubert 2013 Du corps au désir — gates desire/body/vrai dehors concept-page integration; cross-references to Saint Aubert 2021 and 2023 (both ingested) provide partial mediation but not source-level verification.

  • Faul 2024 Painter's Courage — does NOT exist; the canonical fabricated citation per CLAUDE.md Rule 16. Continues to be deterministically swept (Agent C confirms clean).

  • Heinbokel 2024 — present in raw/ since 2026-04-25 but not yet ingested. Would discharge the false-friend caution on [[coherent-deformation]] Open Questions.

5. Citation risks remaining after sampling

Per Agent C's Phase 6 sweep: 25 random sample, 22 ✓ / 3 medium FLAGs / 0 fabrications. Pass rate 88%. All 6 supported claims clean under Rule 18. Faul / "Painter's Courage" / JBSP 55:2 / 2024 fabrication pattern: clean across concept / source / entity / question pages.

Lead applied 1 of the 3 FLAGs ([[ambiguity-vs-ambivalence]] Saint Aubert 2013 reframing). The other 2 FLAGs cluster on: 1 stale slug on [[realist-thought]] (Lead applied as item 19 — slug fix); the borderline cases on entities/caleb-faul.md (Faul caution) and saintaubert-2023-etre-et-chair.md:588 (Saint Aubert 2006 unmediated content claim) are deferred as low-priority Lead reframes.

Sample bias acknowledgment (R3): the biased sample (post-2026-04-28 frontier + audit-produced pages from Phase 8 runs 2–7) is evidence of low fabrication concentration in the sampled regions; it does not certify the unsampled portion of the wiki.

Remaining citation risks:

  • The schema-changelog file-location discrepancy (CLAUDE.md says wiki/, file at root) is a documentation drift, not a citation risk. Defer to user adjudication.

  • 7 broken/stale slug references discharged in Phase 8 (Step 8.9 cite-back) by promote-or-refactor (defaulted to refactor for all).

See: wiki/.audit/citation-integrity-2026-05-05.md.

6. Highest-epistemic-return future ingests

Ranked by impact on currently-deferred work:

  1. Saint Aubert 2006 Vers une ontologie indirecte. Highest single payoff. Discharges the Priority A Saint Aubert backlog (5 pages); enables potential supported promotion of mp-painter-as-primary-witness-for-indirect-ontology and wild-being-extends-to-physics and time-as-late-mp-privileged-ontological-clue; corroborates or qualifies the late-MP indirect-ontology architecture.

  2. Beauvoir Le deuxième sexe (1949). Discharges mp-beauvoir-1949-convergence-on-gender (candidate → live); enables [[gender-as-cultural-developmental]] body integration; provides anchor for further CPP ch. 7 §IX work.

  3. Berghofer-Wiltsche 2024 Phenomenology and QBism. Discharges [[wild-structure]] Open Questions; enables potential supported promotion of wild-being-extends-to-physics.

  4. Heinbokel 2024 (already in raw/; un-ingested). Discharges the false-friend caution on [[coherent-deformation]] Open Questions.

  5. Saint Aubert 2013 Du corps au désir. Enables desire/body integration; cross-refines Saint Aubert 2021 and 2023 readings.

7. Deferred items queued for next audit cycle

Per Phase 7 initial pass §"Defer" (26 items) plus Phase 8 sub-report subsequent-run notes:

Step 8.5 deferred to next Phase 8 run (5 pages, per F's cap recommendation):

  • [[passivity]], [[contingency-of-the-future]], [[perceptual-faith]], [[lateral-universal]], [[primordial-expression]].

Step 8.5 δ-affected pages still deferred (3 pages, pending further architectural propagation):

  • [[institution]] (already upgraded in seventh run; check for residual gaps), [[fundamental-thought-in-art]], [[ineinander]].

δ-affected halt-pending claims (9 slugs) blocked from supported promotion until γ-decision propagation completes. Specifically: science-secrete-stiftung-chiasm (now contested), kaushik-stiftung-literary-frame, taddio-secret-science-as-gestalt-perception, cryptic-institution-extends-beith, ip-pop-architectural-hierarchy, ineinander-universalizes-institution, faul-institutional-camp, time-as-late-mp-privileged-ontological-clue, mp-1942-already-prefigures-late-sedimentation.

User-adjudication items:

  • Schema-changelog file-location discrepancy (file at repo root, CLAUDE.md says wiki/). Decision: move file or update CLAUDE.md.
  • Borderline Faul caution on entities/caleb-faul.md — keep where it is or relocate to claims.md Counterpressure.
  • 17 source pages missing sources: frontmatter field — backfill (per-page values require user judgment).

Defer to next lint pass:

  • 38 tag-vocabulary drift items.
  • 15 malformed wikilinks in wiki/questions/science-secrete-extraction-miss-audit.md.
  • 2 untyped Connections bullets.
  • 104 stub-target wikilinks (non-blocking per CLAUDE.md).

Defer to next ingest cycle:

  • Saint Aubert 2026-04-25 backlog (5 Priority A + 10 Priority B) — gated by Saint Aubert 2006 raw absence.
  • 25 silent-key candidate subsection-creations (Agent B; too granular for Phase 8 cap).
  • New [[machenschaft]] dedicated concept page (Agent B Tier 1 silent-key; HUB corpus weight; motifs.md already references).
  • New [[pensee-de-survol]] page or cross-page tracking decision (Agent B; user decision required).
  • Various body integrations on concept pages (CPP-thematic, SB-1942-thematic, Morris-2024-thematic) — interpretive depth beyond mechanical Sources updates.

Pre-promotion claim candidates for next Phase 8:

  • mp-stimmung-as-1947-anticipation-of-foi-interrogative (Agent B identified pre-promotion candidate; defer to next Phase 8 evaluation).

Run completion summary

  • Date: 2026-05-05
  • Audit version: v1.5
  • Phase 8 run number: 8 (eighth run)
  • Final claim-state counts: 81 entries (6 supported / 43 live / 31 candidate / 1 contested / 0 retired)
  • Page totals: 407 (51 Sources / 225 Concepts / 110 Entities / 21 Questions; +1 entity from previous baseline)
  • Files committed in this audit: AUDIT_PLAN.md (v1.5 header + decision); wiki/index.md, wiki/overview.md, wiki/claims.md, wiki/motifs.md, wiki/log.md (4 entries); 30+ concept/source/entity pages; 1 new entity stub; 13 new audit reports under wiki/.audit/.

The audit closes. The next Phase 8 run can take the deferred queue items at any time; no immediate trigger requires it.


Cross-reference (added 2026-05-08): the deferred queue items above (HUB optional-section gaps, δ-affected claim supported-promotion HALTs, future ingest targets) are now consolidated in wiki/.audit/next-actions.md alongside the silent-keys 2026-05-07 PASS items (now staged via bridge cards in weave-pass3-run3-2026-05-08.md), the user-adjudication backlog, hard raw/ absences, and outstanding lint substantive findings. The next-actions queue is navigational, not authoritative — this synthesis report remains ground-truth for the audit-cycle items it originated.